Indexed by:
Abstract:
As an essential step during product recovery, disassembly has gained widespread attention with the growing awareness of sustainable development, and various problems around disassembly have been investigated. This paper integrates the facility location and disassembly line balancing problem to minimize the total cost as well as minimize the cycle time of the disassembly line. For the studied problem, a bi-objective mixed-integer programming model is formulated. Based on the problem properties, an epsilon-constraint method is proposed to solve the studied problem. Numerical experiments on an illustrative example and benchmark instances are conducted to demonstrate our proposed model and method. Copyright (C) 2022 The Authors.
Keyword:
Reprint 's Address:
Version:
Source :
IFAC PAPERSONLINE
ISSN: 2405-8963
Year: 2022
Issue: 10
Volume: 55
Page: 1086-1091
ESI Discipline: ENGINEERING;
ESI HC Threshold:66
Cited Count:
WoS CC Cited Count: 3
SCOPUS Cited Count: 3
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 0
Affiliated Colleges: