The optimal support timing for the tailrace tunnel of a certain HSP was determined through the load release method. The results show that when the load release rate (LRR) of the surrounding rock (SC) reaches 80%, the deformation increment at the measuring points increases significantly, and this is the best support timing for this deep-buried tunnel. Taking the UP of this hydropower station project (HSP) as an example, the distribution laws of the deformation and stress of the SC of the underground powerhouse (UP) under the condition that the excavation LRR is 80% are obtained through the typical calculation example of three-dimensional nonlinear FEA. The results show that stress concentration is prone to occur at the top arch, bottom plate, and especially at the corners of the chamber. Therefore, enhanced support measures should be taken during the subsequent support construction. © 2025 IEEE.

Keyword:

Hydraulic structures Hydroelectric power Hydroelectric power plants Timing circuits Tunnels

Community:

  • [ 1 ] [Zhao, Junbo]Fuzhou University, Fuzhou, China

Reprint 's Address:

Email:

Show more details

Related Keywords:

Source :

Year: 2025

Page: 1580-1587

Language: English

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count:

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 0

Affiliated Colleges:

Online/Total:1414/13877413
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1