Indexed by:
Abstract:
The partner selection problem with bid cost and completion time factors with a due date constraint is a fundamental problem in virtual enterprises. This problem was proved to be a NP-complete problem. To develop a branch and bound method for this problem, a nonlinear integer-programming model was constructed. Monotone properties of objective function and constraint function were proved in this model. By the properties, a necessary and sufficient condition was found to determine an infeasible problem, and a sufficient condition was established to deter mine a problem with a known optimal solution. Moreover, a binary search method was designed to shrink sub-boxes generated by the method. Numerical experiments showed that the branch and bound method with these techniques was effective.
Keyword:
Reprint 's Address:
Email:
Version:
Source :
Computer Integrated Manufacturing Systems, CIMS
ISSN: 1006-5911
CN: 11-5946/TP
Year: 2006
Issue: 8
Volume: 12
Page: 1340-1344
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 0
Affiliated Colleges: