Indexed by:
Abstract:
The viaduct No.II of Shikongshan in Zhangzhou-Longyan expressway goes through a high slope area with complicated engineering geological condition. There are three sets of dominant structural planes J1, J2, J3 developed in the high slope rock masses. The slope surfaces combined with single dominant structural plane of rock masses, two sets of dominant structural planes and three sets of dominant structural planes, are analyzed by stereographic projection, respectively. The result shows that the natural slope is basically stable. Furthermore, the stability of slope to be excavated and natural slope is evaluated by Sarma limit equilibrium method, and the calculation results show that the high slope is integrally stable.
Keyword:
Reprint 's Address:
Email:
Version:
Source :
Chinese Journal of Rock Mechanics and Engineering
ISSN: 1000-6915
CN: 42-1397/O3
Year: 2002
Issue: 1
Volume: 21
Page: 43-47
Cited Count:
SCOPUS Cited Count:
ESI Highly Cited Papers on the List: 0 Unfold All
WanFang Cited Count:
Chinese Cited Count:
30 Days PV: 2
Affiliated Colleges: