• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索

author:

Wu, P. (Wu, P..) [1] | Li, N. (Li, N..) [2] | Cheng, J. (Cheng, J..) [3] | Chu, C. (Chu, C..) [4]

Indexed by:

Scopus

Abstract:

The global trend of increasing resource utilization in industry has drawn great attention from researchers and practitioners. Industrial managers are increasingly optimizing their production strategies based on time-of-use (TOU) electricity tariffs to reduce energy consumption costs. This study investigates a new energy-efficient single-machine scheduling problem with release dates under TOU electricity tariffs. It consists in sequencing a set of jobs with release dates to a machine under TOU pricing to minimize the total energy cost given a bounded maximum completion time. We first formulate the problem using the widely used time-indexed mixed-integer linear programming (T-MILP). Due to its time-consuming disadvantage, a new period-based MILP (P-MILP) model is developed based on the characteristics of the problem. Given the NP-hardness of the problem, a two-stage heuristic (TSH) algorithm is proposed to solve practical-sized problems. Specifically, in the first stage, a constructive heuristic is designed to obtain an initial solution, and in the second one, a tailored tabu search is devised to yield a better satisfactory solution. Numerical experiments are conducted on a real-life case and 1150 randomly generated instances with up to 1000 jobs. Computational results show that (i) the proposed models can save the total electricity cost by about 30% compared with an existing empirical scheduling method when solving small-sized instances; (ii) the efficiency of P-MILP is about 140.94% higher than that of T-MILP; and (iii) the proposed TSH algorithm can efficiently obtain high-quality solutions for practical-sized instances with gaps of less than 7% compared to the lower bounds, which can effectively support production managers to save the energy costs in practical production. © 2023 Elsevier Ltd

Keyword:

Mixed-integer linear programming Release dates Single-machine scheduling TOU electricity tariffs Two-stage heuristic algorithm

Community:

  • [ 1 ] [Wu, P.]School of Economics and Management, Fuzhou University, 350108, Fuzhou, China
  • [ 2 ] [Li, N.]School of Economics and Management, Fuzhou University, 350108, Fuzhou, China
  • [ 3 ] [Cheng, J.]School of Economics, Fujian Normal University, 350117, Fuzhou, China
  • [ 4 ] [Chu, C.]School of Economics and Management, Fuzhou University, 350108, Fuzhou, China

Reprint 's Address:

  • [Cheng, J.]School of Economics, China

Show more details

Related Keywords:

Source :

Journal of Cleaner Production

ISSN: 0959-6526

Year: 2023

Volume: 393

9 . 8

JCR@2023

9 . 8 0 0

JCR@2023

ESI HC Threshold:35

JCR Journal Grade:1

CAS Journal Grade:1

Cited Count:

WoS CC Cited Count:

SCOPUS Cited Count: 2

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 1

Affiliated Colleges:

Online/Total:62/10044277
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1