• Complex
  • Title
  • Keyword
  • Abstract
  • Scholars
  • Journal
  • ISSN
  • Conference
成果搜索

author:

Wu, Peng (Wu, Peng.) [1] (Scholars:吴鹏) | Li, Nan (Li, Nan.) [2] | Cheng, Junheng (Cheng, Junheng.) [3] | Chu, Chengbin (Chu, Chengbin.) [4]

Indexed by:

EI Scopus SCIE

Abstract:

The global trend of increasing resource utilization in industry has drawn great attention from researchers and practitioners. Industrial managers are increasingly optimizing their production strategies based on time-of-use (TOU) electricity tariffs to reduce energy consumption costs. This study investigates a new energy-efficient single-machine scheduling problem with release dates under TOU electricity tariffs. It consists in sequencing a set of jobs with release dates to a machine under TOU pricing to minimize the total energy cost given a bounded maximum completion time. We first formulate the problem using the widely used time-indexed mixed-integer linear programming (T-MILP). Due to its time-consuming disadvantage, a new period-based MILP (P-MILP) model is developed based on the characteristics of the problem. Given the NP-hardness of the problem, a two -stage heuristic (TSH) algorithm is proposed to solve practical-sized problems. Specifically, in the first stage, a constructive heuristic is designed to obtain an initial solution, and in the second one, a tailored tabu search is devised to yield a better satisfactory solution. Numerical experiments are conducted on a real-life case and 1150 randomly generated instances with up to 1000 jobs. Computational results show that (i) the proposed models can save the total electricity cost by about 30% compared with an existing empirical scheduling method when solving small-sized instances; (ii) the efficiency of P-MILP is about 140.94% higher than that of T-MILP; and (iii) the proposed TSH algorithm can efficiently obtain high-quality solutions for practical-sized instances with gaps of less than 7% compared to the lower bounds, which can effectively support production managers to save the energy costs in practical production.

Keyword:

Mixed-integer linear programming Release dates Single-machine scheduling TOU electricity tariffs Two-stage heuristic algorithm

Community:

  • [ 1 ] [Wu, Peng]Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
  • [ 2 ] [Li, Nan]Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
  • [ 3 ] [Chu, Chengbin]Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
  • [ 4 ] [Cheng, Junheng]Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China

Reprint 's Address:

  • 储诚斌

    [Chu, Chengbin]Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China;;[Cheng, Junheng]Fujian Normal Univ, Sch Econ, Fuzhou, Peoples R China

Show more details

Related Keywords:

Source :

JOURNAL OF CLEANER PRODUCTION

ISSN: 0959-6526

Year: 2023

Volume: 393

9 . 8

JCR@2023

9 . 8 0 0

JCR@2023

ESI Discipline: ENGINEERING;

ESI HC Threshold:35

JCR Journal Grade:1

CAS Journal Grade:1

Cited Count:

WoS CC Cited Count: 1

SCOPUS Cited Count: 2

ESI Highly Cited Papers on the List: 0 Unfold All

WanFang Cited Count:

Chinese Cited Count:

30 Days PV: 0

Online/Total:215/10034270
Address:FZU Library(No.2 Xuyuan Road, Fuzhou, Fujian, PRC Post Code:350116) Contact Us:0591-22865326
Copyright:FZU Library Technical Support:Beijing Aegean Software Co., Ltd. 闽ICP备05005463号-1